Ajustari:
mrp.bom EN: - field value_overhead was added - it is a percent for indirect expenses - rouding quantity at BOM explosion in conformity with the definition of measurement units
RO: - adaugat campul value_overhead - procent pt cheltuieli indirecte - rotunjire cantitate la explozia BOM in conformitate cu definitia unitati de masura
mrp.production EN: - method action_confirm was modified - date_expected was modified for the movements generated by command of production - auto generation of a production batch if the product is managed in batches RO: - modificat metoda action_confirm - modificare date_expected pentru miscarile generate de comanda de productie - generarea automata a unui lot de productie daca produsul este gestionat in loturi
mrp.production.product.line EN: - field available quantity was added - method onchange_product_id was added RO: - adaugat camp cantitate disponibila - adaugat metoda onchange_product_id
Reports:
deltatech.mrp.report EN: report for analyzing costs of production RO: - raport pt analiza costuri de productie
Observation:
- at the material cost it must be added a coefficient of 20 % for indirect costs
Observatie:
- la costul materialelor se adauga si un coeficient de 20 % pentru costurile indirecte.
Table of contents
Bugs are tracked on Terrabit Issues. In case of trouble, please check there if your issue has already been reported.
Do not contact contributors directly about support or help with technical issues.
- Terrabit
- Dorin Hongu
Current maintainer:
This module is part of the dhongu/deltatech project on GitHub.
You are welcome to contribute.