Skip to content

Cost associated with Operational Performance Testing  #186

Open
@mike-gangl

Description

@mike-gangl

Cost associated with Operational Performance Testing

Might not have the funding available to do a real-life performance test. Mitigations need to include what we can do if the costs are too high.

Actions

  • Pen and paper exercise to determine cost of TIR and VSWIR level tests.
  • Determine a ramp up in testing to get to the TIR and VSWIR forward rates (this PI if possible)
  • Determine a ramp up in testing to get to the TIR and VSWIR reprocessing rates (future PI work?)

Associated Objectives

links to risk issues associated with this epic

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    Status

    In Progress

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions