Update dependency blinker to v1.9.0 #49
Open
Red Hat Konflux / Red Hat Konflux / firelink-backend-on-pull-request
failed
Jan 11, 2025 in 2m 7s
Failed
Red Hat Konflux/firelink-backend-on-pull-request has failed.
Details
- Namespace: hcm-eng-prod-tenant
- PipelineRun: firelink-backend-on-pull-request-5w2f2
Task Statuses:
Status | Duration | Name |
---|---|---|
✅ Succeeded | 6 seconds | |
✅ Succeeded | 18 seconds | |
❌ Failed | 1 minute | |
✅ Succeeded | 14 seconds |
Failure snippet:
task build-container has the status "Failed":subprocess exited with status 1 subprocess exited with status 1 Error: building at STEP "RUN pip install -r requirements.txt": exit status 1
Loading