Check if we can take the reset transition on the inventory update entity #98
build.yaml
on: push
Matrix: code-coverage
Matrix: coding-standards
Matrix: dependency-analysis
Matrix: integration-tests
Matrix: Mutation tests
Matrix: static-code-analysis
Matrix: unit-tests
Annotations
9 errors
Mutation tests (8.2, highest)
Process completed with exit code 139.
|
Code Coverage (PHP8.2 | Deps: highest)
Process completed with exit code 139.
|
Integration tests (PHP8.1 | Deps: highest | SF~5.4.0)
The hosted runner: GitHub Actions 60 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Integration tests (PHP8.1 | Deps: highest | SF~6.4.0)
The job was canceled because "_8_1_highest__5_4_0" failed.
|
Integration tests (PHP8.1 | Deps: highest | SF~6.4.0)
The operation was canceled.
|
Integration tests (PHP8.2 | Deps: highest | SF~6.4.0)
The job was canceled because "_8_1_highest__5_4_0" failed.
|
Integration tests (PHP8.2 | Deps: highest | SF~6.4.0)
The operation was canceled.
|
Integration tests (PHP8.2 | Deps: highest | SF~5.4.0)
The job was canceled because "_8_1_highest__5_4_0" failed.
|
Integration tests (PHP8.2 | Deps: highest | SF~5.4.0)
The operation was canceled.
|