Skip to content

chore(deps-dev): bump rimraf from 5.0.8 to 6.0.1 #192

chore(deps-dev): bump rimraf from 5.0.8 to 6.0.1

chore(deps-dev): bump rimraf from 5.0.8 to 6.0.1 #192

Triggered via pull request August 9, 2024 21:37
Status Failure
Total duration 30s
Artifacts

tests.yml

on: pull_request
Matrix: ESLint
Matrix: Run tests
Check commit messages
16s
Check commit messages
Upload coverage to Codecov
0s
Upload coverage to Codecov
Fit to window
Zoom out
Zoom in

Annotations

7 errors
ESLint (18)
Process completed with exit code 1.
Run tests (18)
Process completed with exit code 1.
Run tests (22)
The job was canceled because "_18" failed.
ESLint (22)
The job was canceled because "_18" failed.
Run tests (20)
The job was canceled because "_18" failed.
Run tests (20)
The operation was canceled.
ESLint (20)
The job was canceled because "_18" failed.