Skip to content

10 oct update. fds_contract done with all tests passed. first draft o… #10

10 oct update. fds_contract done with all tests passed. first draft o…

10 oct update. fds_contract done with all tests passed. first draft o… #10

Triggered via push October 11, 2023 00:55
Status Failure
Total duration 27s
Artifacts

main.yml

on: push
Matrix: functional
Fit to window
Zoom out
Zoom in

Annotations

14 errors
functional (ubuntu-latest, 3.9)
Process completed with exit code 1.
linting
Process completed with exit code 1.
functional (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
functional (ubuntu-latest, 3.11)
Process completed with exit code 1.
type-check
Process completed with exit code 1.
functional (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
functional (ubuntu-latest, 3.10)
Process completed with exit code 1.
fuzzing
Process completed with exit code 1.
functional (macos-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
functional (macos-latest, 3.11)
The operation was canceled.
functional (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
functional (macos-latest, 3.9)
The operation was canceled.
functional (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
functional (macos-latest, 3.10)
The operation was canceled.