-
Notifications
You must be signed in to change notification settings - Fork 10
/
Copy pathORNL-TM-0519.txt
606 lines (288 loc) · 10.5 KB
/
ORNL-TM-0519.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
835 BT
e .sa‘g(\..".g{ »)
OAK RIDGE NATIONAL LABORATOR
i,
B OB ol oy e
. $ d b e%;a & % L ’%—?; Hfo?
UNION CARBIDE CORPORATION
‘ for the
U.S. ATOMIC ENERGY COMMISSION
ORNL- TM- 519
COPY NO. - 6‘,
DATE - March 14, 1963
MSRE MAINTENANCE PROPOSAL
E. C. Hise
ABSTRACT
It is psoposed that the MSRE primary circuit, cell, and shielding and
containment be so designed as to be adaptable to semi-direct maintenance
for certain suitable operations. »
The requirements for and features of semi-direct maintenance are
given. A tentative procedure for replacement of the special graphite bars
by semi-direct means is given.
NOTICE
This document contains information of a preliminary nature and was prepared
primarily for internal use at the Oak Ridge National Laboratory. It is subject
to revision or correction and therefore does not represent a final report. The
information is not to be abstracted, reprinted or otherwise given public dis-
7 semination without the approval of the ORNL patent branch, Legal and Infor-
mation Control Department,
g
s
LEGAL NOTICE
This report was prepared as an account of Government sponsored work. Neither the United States,
nor the Commission, nor any person acting on behalf of the Commission:
A. Makes any warranty or representation, expressed or implied, with respect to the accuracy,
completeness, or usefulness of the information contained in this report, or that the use of
any informotion, apparctus, method, or process disclosed in this report may not infringe
privately owned rights; or
B. Assumes any liabilities with respect to the use of, or for damages resulting from the use of
any information, apparatus, method, or process disclosed in this report.
As used in the above, "‘person acting on behalf of the Commission’ includes any employee or
contractor of the Commission, or employee of such contractor, to the extent that such employee
or contractor of the Commission, or employee of such contractor prepares, disseminates, or
provides access to, any information pursuant to his employment or contract with the Commission,
or his employment with such contractor.
by
It is proposed that a semi-direct maintenance system.be.inporporated
in the MSRE design as a parallel to the remote system. The dual method
would provide the operator a-choice of system to be used depending upon
the magnltude and type of .work to be performed and would,provide the safety .
factor of a’ spare.
‘Many small cperatlons, such as visual inspections, retightening bolts,
replacing heaters, checking auxiliary system leaks, and changing over to
spare auxiliary connections of various kinds are well suited to the ssemi-
direct system. Several major operations, such-as the removal and replace-
ment of the pump motor; the pump rotary. element and the special core graphite
bars, appear to be amenable to semi-direct Work. -Other major operations,
such as the removal and replacement of the heat exchanger and core vessel,
would perhaps be best done by a combination of the methods whereby the dls—
connections will be done and the component prepared for lifting by sem1~
direct means and the operation completed by remote means.
The general design reguirements to enable semipdirect mbintenance are:
A modular seal membrane (Fig. 2) which could be removed either as a
unit or in modules,k :
A modular lower shield (Fig‘-o 2) which.Could,bewremovgdueithgr'as beams
or in modules. ' ‘ a
Arrangement of the modular shield with respect to reactor. components
to provide maximum accessibility.
Arrangement of auxiliary pipingkand\wiring in a few cases to permit lateral
movement of a component in a specifie direction within the cell.
The additional equipment required would be:
A portable work shield (Fig. U4) consisting of horizontal steel or lead
slides roller mounted on tracks and motor driven for remote opening and
closing. -The slides would have vertical holes for windows, .viewing devices,
lights, and tools. The holes would be filled with plugs when not in use.
It would cover the opening left by the- removal of one lower shield module.
Qnefor‘se?eral«sma11 shield windows~to*fit:€he holes.
A suitable periscope
Simple tools such as long handled wrenches and hooks. Many of these would
be fabricated as mneeded. - .
A generalized but entirely feasible procedure for the removal and replace-
ment of the special graphite bars is presented to illustrate the semi-direct
system. All operations described are with personnel in Zone II and on the
cell shield except where marked.with an *.
1. Remove the upper shield beams (probably two ) necessary to uncover the
-appropriate seal membrane module.
o
2. Cutpthe seal weld and remove the membrane module.
3. Place the portable shield assembly_over“the.modular shield plug
to be removed. Open the slides so as to clear the plug. Attach the crane
to the plug. . - : ' '
%l -Raise-the,shield:plug and close. the slides.
5. Install windovs and lights in the portable shield.
6. Insert the appropriate tools and, with dlrect vision through the
windows or perlscope if necessary, dlsconnect the pump power and instrument
leads and the service piping. Remove the rotary element hold down bolts.
‘Withdraw the tools. These can be pulled into plastic bags if necessary.
T .Center the:cranetwith special hook:fiXture over the motor 1lift bail
: %8, gpen the portable shleld slides, lower the hook fixture through the
shield; and close the slides.
9. By dlrect observatlon attach the crane to.the‘llft bail. Raise
the rotary element approx1mately 2 1/2 £t to clear. the fixed pump hous1ng
The rotary element will still be well below the. bottom of the portable
shield. ,
10. Using the movable . slide, crane,‘and'dlreCt vision, transport the
‘rotary element to a preplaced hook within the. cell ‘hang up the rotary
-element, and dlsengage the crane hook o
-*ll. gpen the slldes remove the hook and close the slides
12. Place a shlelded carrler w1th open tqp and bottom through the portable
shield over the pump bowl. Insert the graphite removal tool through the carrier
and latch it onto a graphite bar. Withdraw the bar into the carrier and '
close the bottom door. = Unlatch the tool, withdraw it from the carrier, and
park it in the.cell. Close the top door of the carrier, withdraw the carrier
into a plastlc bag, and withdraw the shielded and contained bar from the cell.
Repeat for each bar to ‘be removed. Alternatlvelyplt may be more desirable
to have one carrler accommodate all five graphite bars.
13, At th1s tlme,'lf it is des1rable, viewing devices can be placed in
the core vessel and the upper and lower plenums, etc -examined.
1L4. . Attach each replacement bar in turn to the insertion tool and place
in. reactor :
15.. Reassemble the.reactor“andnshield with the reverse of steps'léll
above. - . o
A recapitulation of the features-of.the:semirdirect System follows:
1. Access to the primary system for a specific operation requires the
removal of “two upper shield beams, one membrane module, and one lower
shleld.module, and the placement of the portable- shleld
wy
: c .
Y © s
. v
. . '
L
5 :
. ¢
-
e “
PO
s
v
s <
T
¥
’
. ¢
-
. ki
.
. . -
<
€als
2. .The required air flow is that to maintain a down draft through the
small openings in and around the portable shield and thereby prevent airborn
contamination.
3. Direct vision or optical aids may be used at all times.
4. Multiple "hands" may be used simultaneously.
5. "Feel" is retained by the operater.
6. Access to Zone IT is<assured duringealmost all of the;operationd
7. Maintenance equlpment failure is ea81ly ramedled with the p0581ble'
exception of the coincidental failure of the crane while tranaportzng an
unshielded, radioactive item in Zone 11 which is a- dlfflcult prdblem regardless
of method. : :
8. Special or replacement tooling can usually be fabricated Quiekly
since much of it will be standard wrenches o7 hand tools with -long handles
attached. ‘ -
9. Proper control of air flow and of all items removed from the cell
will prevent: contamlnatlon of Zone II. :
10. Clean up after.an operation requires the replacement;ofvthe lower.‘
‘shield module, removal of the portable shield, rewelding the membrane
module, and replaclng the upper beams
Figure 1 shows the upper shield in 3 l/Z ft wide beams. -The division
of the upper shleldlnto beams of approximately this width is dictated by
the capacity of the building crane. ‘The reinforcement and fastening of these
‘beams would be the same as in the presently contemplated design.
Figure 2 shows the modules for both the seal membrane and the lower
shield. In the case -of the seal membrane,the circumferential weld can be
cut permitting the membrane to be removed as a unit or the peripheral weld
of any 3 1/2 ft x 5 ft module can be cut and the module remowved.
.In the case of ‘the lower shield each 3 1/2 ft wide- beam may be removed
as a unit or any of the 3 1/2 ft x 5 £t modules may be removed 1nd1v1dually
Figure 3 shows how.the seal membrane'modules are welded together and
how clearance for the seal weld lip is provided in the upper shield besms.
‘The steel structure that supports and ties together the lower shield
modules into a beam is shown. '
»Figure.h,is borrowed but illustrates the principle of:d portable
shield having movable slides and access holes.
s e
Wi —~ A
Btz
’ ‘.J/:“A" ”tq .
B
e S > st T st s .il.ll..l‘..ll”u’.
}’Lll‘ - iy - —
i
!
l
%
t
i
!
!
|
% 5
!
1
i
|
|
1
|
i
i
1
!
|
]
!
e
A iy — B ——— e A 5 et A .+ . ettt e B
- - e e ———— e e - e —
:
{ ‘ _
| ———— e -
1
:
i - |
| 4 g
i
— - e e e s —— e - e g e — cat —— —— —— — et
Y - e e ssvnd o - e s b i <83 - gt g
N
e - ~ -
i ; g {
e > |
& bebdind Lo s i
!
; el i O e S S e — e ———— . ————— ey
- HWSKE
L0548 2158
L
-
oee?
~
Upper Sw éir
fer
A
4 2
JIRAN G5
7/ -.{:_ ’//J"" &
»
é[.: F—d',éé. -5’/'7 ,3: 57
Yo
S«
e,
i i
¥
P
#
3
- 4 A
-
—y
e — e ey
Sgcrion
ORNL~LR=Dwg. =52301
UNCLASSIF IED
WL LRI H ’ ¥ b[fl“fi?
e < w,
£ i
" A (.ll ‘
S 1
ke
) SEenl '
A M;‘"IA/‘I" ¢
f/{f’n‘.(' SHieL o 5:;4‘/'1
Oy j‘-' LAowé A
L 4 : ”
oAl : SmiEALS
‘ al o £
¢ <‘A/" &
£ \
UNCLASSIFIED
Fra 4l
EpraRl & SHELL
et
#
1-3.
L.
DTIE, AEC
M. J. Skinner