-
Notifications
You must be signed in to change notification settings - Fork 10
/
Copy pathORNL-TM-5759.txt
3963 lines (2437 loc) · 116 KB
/
ORNL-TM-5759.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
ORNL/TM-5759
g/L 77/
Distribution and Behavior of
Tritium in the Coolant-Salt
Technology Facility
G. T. Mays
A. N. Smith
J. R. Engel
HASTER
" OAK RIDGE NATIONAL LABORATORY
e OPERATED BY UNION CARBIDE CORPORATION FOR THE ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION
Printed in the United States of America. Available from
National Technical Information Service
U.S. Department of Commerce
5285 Port Royal Road, Springfield, Virginia 22161
Price: Printed Copy $4.50; Microfiche $3.00
This report was prepared as an account of work sponsored by the United States
Government. Neither the United States nor the Energy Research and Development
Administration/United States Nuclear Reguiatory Commission, nor any of their
employees, nor any of their contractors, subcontractors, or their employees, makes
any warranty, express or implied, or assumes any legal liability or responsibility for the
accuracy, completeness or usefuiness of any information, apparatus, product or
process disclosed, or represents that its use would not infringe privately owned rights.
ORNL/TM~5759
Dist. Category UC-76
Contract No. W-7405-eng-26
Engineering Technology Division
DISTRIBUTION AND BEHAVIOR OF TRITIUM IN THE
COOLANT-SALT TECHNOLOGY FACILITY
G. T. Mays A. N. Smith
J. R. Engel
Date Published - April 1977
NOTICE
This report was prepared as an account of work
sponsored by the United States Government. Neither
the United States nor the Unijted States Energy
Research and Development Administration, not any of
their employees, not any of their contractors,
subcontractors, or their employees, makes any
warranty, express or implied, or assumes any legal
liability or responsibility for the accuracy, completeness
or usefulness of any information, apparatus, product or
process disclosed, or represents that its use would not
infringe privately owned rights,
NOTICE: " This document contains information of a preliminary
nature. It is subject to revision or correction and there-
fore does not represent a final report.
Prepared by the e T
OAK RIDGE NATIONAL LABORATORY | A ? g E{\
Oak Ridge, Tennessee 37830 g%’fi@%t
.
operated by
UNION CARBIDE CORPORATION
for the
ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION
S me s s T g
pul e et POy A T e s ThoanTy b et bR AT
s bR U U Ll U‘-..i‘»lL-diSih»i{; }( UE\;_H(I“':-;?{}\
§
|
&
CONTENTS
Page
ABSTRACT ...t iienineeenntnensnscacssssesnsosna e es s et easesenenaennns 1
1. INTRODUCTION .. eiennncenueonsensosannnns T isesesatesnasaaes - 2
1.1 Tritium in MSBR ...ttt enannes Ce s e et aae s 2
1.2 Tritium in the MSRE ittt iiiittineretneenennnnenn 3
1.3 Proposal for Limitation of Tritium Transport .....c.ccee.. 4
2. COOLANT-SALT TECHNOLOGY FACILITY (CSTF) vveetnnnencnernnananns 4
2.1 Primary Function and Capabilities ......ci.iieiireencnnnnnan 4
2.2 Description of Physical Parameters of CSTF .........c..... 5
2.3 Operating History of CSTF ......vuuns e r e es et s . 7
2.4 Equipment for Tritium TeSES +.iveiversreerreneeesoonnnsnenas 8
2.4.1 CSTF physical parameters for tritium tests ........ 8
2.4.2 Addition of tritium to CSTF ... vereeveonnnnnnnnns 8
2.4.3 Salt sampling ..vevevvrscrncvas Cet i ee ettt . 12
2.4.4 Off-gas sampling SYSLEM ...ivireieneneeoonoensonnes 12
2.4.5 Cooling duct air sampling system ......ccceveeeunnnn 14
2.4.6 Hydrogen partial pressure probe .......iciveennenn. 15
3. GENERAL DESCRIPTION OF EXPERIMENTS ... eerrrenreenoanns Ceenna 15
4, RESULTS OF TRANSIENT EXPERIMENTS ..ttt eernennnsreernannnsnenns 19
4.1 Experiment Tl .o eievieeiieenonosensosessonnnsesennnnnsenss 19
4.2 Experiment T2 .. .uieeeeieeensatnsenseesnssoesnnosooseanennss 22
4.3 Experiment T3 .....ccevieenns S e ceneaerstieententeaes Ceean 25
4.4 Summary of Transient Experiments T1, T2, and T3 .....c..... 29
5. RESULTS OF STEADY~STATE EXPERIMENT T4 ... vieiieenrennnnenaenns 30
5.1 Buildup and Attainment of Steady-State Conditions ........ 31
5.2 Change in Off-Gas Flow Rate ..eveveucesve Chieaseaaaas ceienn 37
5.3 Stripping Period ....... ceeseneaas Srrercranesrersarnearens 38
5.4 Tests for Tritium Concentration in Addition Gas .......... 38
6. RESULTS OF STEADY-STATE EXPERIMENT T5 ......... Ces ettt r e 38
6.1 Buildup and Attainment of Steady-State Conditions ........ 40
6.2 NaBO; Addition to CSTF ...ttt ieitneettioneenceaeronnaennas 44
6.3 B303 Addition to CSTF i vurernenteonococorosascnsrenennnss L6
6.4 Helium Leak Detector Measurements ..........oeoce.. e 47
6.5 Extraneous Source of Hydrogen in 0ff-Gas System .......... 48
6. Stripping Period .....iiiirrerirererraecartittosnesaaranens 50
7. INTERCOMPARISON AND INTERPRETATION OF EXPERIMENTAL RESULTS .... 51
8. EXTRAPOLATION TO MSBR CONDITIONS ... iverienreveesnosnnannnnnnns 53
iii
10.
11.
12.
13.
iv
Page
FURTHER EXPERIMENTATION REQUIRED « v ceveeecneonecncnncnnennnns 56
CONCLUSION 4 veetennenenneneenesnennns e eeneaeeaa U 57
ACKNOWLEDGMENTS +vvvvvuernesnssnoensncsnsnnes e .. 58
REFERENCES ........ caneas ceenaerans ceettssseevertaseeans sesass 58
10.
LIST OF TABLES
Sources and rates of production of tritium in a 1000-MW(e)
)
Operating and geometrical parameters assumed for CSTF
tritium testsS «oeeenooeens e et e e S e e e s e e esac e st e e aee s
Summary of tritium addition experiments Tl, T2, and T3
in CSTF ....... * % & & B & 5 B 0 5 s PO BB F KRS S P E RSB T FE PR s s s
Steady—-state material balance for experiment T4 ..........0...
Overall system material balance at steady-state for
exXperiment T4 .ueeeieriraeeeosneneesososnsesoenssonesnenssosnnss
Representative hydrogen partial pressure probe measurements
for experiment T4 ...vviveeenns et et e st eaat st
Steady-state material balance for experiment T5 .............
Representative hydrogen partial pressure probe measurements
for experiment T5 ..... N e e e e aae e e et e ettt ettt et e e e
Summary of tritium addition experiments T4 and T5 in CSTF
Extrapolation of results from CSTF tritium experiments to
MSBR Conditions ....... * ® ® 8 8 8 S N & s e P d & 8 & & 5 ¢ 2 4 v & ks sk PP b & s 0
10
30
34
35
36
42
44
51
54
W 0 ~N O Ut >
- . .
= e
W N = O
vii
LIST OF FIGURES
CSTF Schematic ..‘...'.....I...I........'lli'..l...l. IIIIIII “ 8
CSTF schematic for tritium experiments ........ et esas cevenns .o
Tritium addition system ........4.. Ceeresens cessaans et Cee
Off-gas sampling System ,.......eoevevrrcnnnencness ceeen
Cooling duct air sampling system .......... esearenneane
Typical hydrogen partial pressure probe measurement ....
Observed tritium concentrations in CSTF, experiment T1 ...
Observed tritium concentrations in CSTF, experiment T2
Buildup of tritium concentration in salt, experiment T2
Observed tritium concentrations in CSTF, experiment T3
Buildup of tritium concentration in salt, experiment T3
Observed tritium concentrations in CSTF, experiment T4 ...
Observed tritium concentrations in CSTF, experiment T5
LI ]
DISTRIBUTION AND BEHAVIOR OF TRITIUM IN THE
COOLANT-SALT TECHNOLOGY FACILITY
G. T. Mays A, N. Smith
J. R. Engel
ABSTRACT
A 1000-MW(e) Molten-Salt Breeder Reactor (MSBR) is
expected to produce 2420 Ci/day of tritium. As much as
607% of the tritium produced may be transported to the
reactor steam system (assuming no retention by the sec-
ondary coolant salt), where it would be released to the
environment. Such a release rate would be unacceptable.
Therefore, experiments were conducted in an engi-
neering-scale facility — the Coolant-Salt Technology
Facility (CSTF) — to examine the potential of sodium
fluoroborate, the proposed coolant salt for an MSBR, for
sequestering tritium. The salt was believed to contain
chemical species capable of trapping tritium. A series
of 5 experiments — 3 transient and 2 steady-state experi-
ments — was conducted from July of 1975 through June of
1976 where tritium was added to the CSTF. The CSTF cir-
culated sodium fluoroborate at temperatures and pressures
typical of MSBR operating conditions.
Results from the experiments indicated that over 907
of tritium added at steady-state conditions was trapped by
sodium fluoroborate and appeared in the off-gas system in
a chemically combined (water-soluble) form and that a total
of v98% of the tritium added at steady-state conditions was
removed through the off-gas system overall.
Extrapolating to MSBR conditions based on a concentra-
tion ratio of V4000 for chemically combined tritium to ele-
mental tritium in the salt observed at steady-state condi-
tions, calculations indicated that less than 10 Ci/day of
tritium would be transported to the reactor steam system.
Such a release rate would be well within established guide-
lines for release of tritium to the environment.
Although a complete understanding of the behavior of
tritium in sodium fluoroborate could not be developed from
this series of experiments due to the termination of the
Molten-Salt Reactor Program, the effectiveness of sodium
f luoroborate to trap tritium was demonstrated. Furthermore,
use of sodium fluoroborate as a secondary coolant in an MSBR
would be expected to adequately 1limit the transport of tri-
tium to the reactor steam system and environment.
1. INTRODUCTION
1.1 Tritium in MSBR
A 1000-MW(e) Molten-Salt Breeder Reactor (MSBR) operating at 2250
MW(t) is expected to produce tritium at a rate of 2420 Ci per full-power
day.1 The major source (Table 1) of tritium is the neutron reactions with
lithium, an important constituent of the MSBR fuel salt, which contains
uranium tetrafluoride and thorium tetrafluoride dissolved in a lithium
fluoride—beryllium fluoride carrier salt. The composition of the fuel
salt, expressed in mole percent of each constituent, is 71.7 LiF, 16 BeFj,,
12 ThFu, and 0.3 UF,.
Table 1. Sources and rates of
production of tritiug in a
1000-MW(e) MSBR
Production rate
(Ci/day)
Ternary fission 31
5Li(n,a) %H 1210
"Li(n,no0)%H 1170
19F(n,170) 2H 9
Total 2420
aFrom Ref. 1.
At the operating temperatures, 700977 K (800—1300°F), of an MSBR,
tritium tends to diffuse through the metal walls of the various systems.
In the migration process tritium is transferred from the primary system
to the secondary coolant salt by diffusion through the walls of the pri-
mary heat exchanger tubes. Tritium in the secondary salt is in turn
transferred through the steam generator tube walls into the steam system,
where it would be converted to tritiated water and discharged to the
environment in the steam system blowdown or the condenser cooling water.
Early calculations?
indicated as much as 1425 Ci/day, or 60%, of the tritium
produced would be transported to the reactor steam system assuming no reten-
tion of tritium by the secondary salt.
Release of the 1425 Ci/d of tritium would be unacceptably high.
The MSBR design limit objective for release was set at 2 Ci/day. The re-
sulting concentration of tritium in the water released to the environ-
ment would be well below established guidelines® for "as low as reasonably
achievable' for release of radioactive material in effluents from light
water reactors. It is assumed that an MSBR would have to meet similar
guidelines.
1.2 Tritium in the MSRE
Some experience with tritium in a molten-salt system was gained from
the Molten-Salt Reactor Experiment (MSRE). This reactor was operated
from 1965 to 1969 at a full power of about 7.3 MW(t). It operated at a
maximum temperature of 927 K (1210°F) with a fuel salt similar to the
MSBR fuel salt. Heat was transferred to a lithium fluoride—beryllium
fluoride coolant salt and removed from the secondary salt by blowing air
over the tubes of a radiator, which was used in place of a steam generator—
superheater, and discharging it up a stack to the atmosphere.
Tritium disposal from the MSRE never presented a significant problem.
The only measurements made were of liquid wastes for health physics moni-
toring purposes. However, a growing concern for tritium production in a
large molten-salt reactor initiated measurements for making a material
balance on tritium in the MSRE.
The calculated production rate was 54 Ci/day, and the observed dispo-
sition of tritium, not including retention in the off-gas system, amounted
to 80% of this production rate: 487% discharging from fuel off-gas system,
2% discharging from coolant off-gas system, 7% discharging in coolant
radiator air, 9% appearing in cell atmosphere, and 147 going into the core
graphite. Most of the remainder was probably held up in o0il residues in
the fuel off-gas systems.
The difference in tritium production between the MSRE at 7.4 Ci day"1
MW(t)—1 and the MSBR at 1.1 Ci day_1 MW(t)“1 is due mainly to the increased
®Li concentration that was present in the MSRE fuel salt.
1.3 Proposal for Limitation of Tritium Transport
One method proposed for limiting tritium transport to the steam system
in an MSBR is based on an isotopic exchange of tritium with a hydrogenous
impurity in the reactor secondary coolant salt. Sodium fluoroborate, the
proposed MSBR coolant salt, is an eutectic mixture containing 92 mole %
NaBF, and 8 mole % NaF. Chemical analyses have shown that the fluoroborate
salt normally contains a hydrogenous impurity produced by the reaction of
water with the salt. Laboratory experiments” indicated that deuterium,
on contacting the salt, is retained by the salt because of isotopic ex-
change with this impurity. Tritium would be expected to behave similarly.
Another potential method for trapping tritium may involve the reaction of
tritium with oxide-containing chemicals in the salt. Once in the chemi-
cally combined form, unlike the elemental form, tritium would not be avail-
able for transport to the steam system. With adjustment of the impurity
level if required, the fluoroborate salt could then be processed for re-
moval of tritium.
Experiments were then proposed for the Coolant-Salt Technology Facility
(CSTF), an engineering-scale facility, to determine sodium fluoroborate's
effectiveness in sequestering tritium. Information from the tritium ex-
periments in the CSTF was to be used in extrapolating to MSBR conditions.
2. COOLANT-SALT TECHNOLOGY FACILITY (CSTF)
2.1 Primary Function and Capabilities
The primary function of the CSTF is to circulate the sodium fluoro-
borate coolant salt at temperatures and pressures typical of MSBR operating
conditions. The facility was designed with the capability to supply cool-
ant salt to a number of side loops for the purpose of (1) extending engi-
neering-scale operating experience with the proposed MSBR coolant salt
and its cover gas, (2) investigating on-line corrosion product traps, (3)
investigating on-line salt monitoring by electrochemical means, and (4)
monitoring the corrosion characteristics of the system by means of sur-
veillance specimens. For the tritium experiments, the CSTF's function
was to circulate sodium fluoroborate while several additions of tritium
were made to determine if the coolant salt would inhibit tritium migration.
2.2 Description of Physical Parameters of CSTF
The CSTF consists of a Hastelloy N pump (the coolant salt pump which
was used in the MSRE) and about 10.7 m (35 ft) of 5-in. IPS sched-40,
6.6-mm (0.258-in.) wall Hastelloy N pipe arranged in the form of a closed
loop (Fig. 1). The system may be operated at a maximum flow of 54 x 1077
m®/s (850 gal/min) using the normal 60-Hz power supply, or at reduced flow
rates using a variable-speed motor—-generator set. The ratio of wetted
surface to salt volume (including the pump tank inventory) is about 20:1
m?/m®. In comparison, the reference-design MSBR has a salt-circulating
rate of 1 m¥/s (16,000 gal/min) for each of four cooling loops and a ratio
of wetted surface to circulating salt volume of about 50:1 m?/m3.
The CSTF has two volumes of salt which are outside the main salt
stream but which communicate with the main salt stream by means of side
loops having relatively small salt flows.* These inventories of salt
are in the bowl of the salt pump and in the salt monitoring vessel (SMV).
Each of these regions is only partly filled with salt, there being a salt-
gas interface and a gas space in each, and the gas spaces are intercon-
nected. During normal operation, inert gas is fed into the pump bowl
continuously by way of the drive shaft purge and cover gas connections.
A small flow (about 70 cm®/min) of BF3, which is used to maintain the de-
sired ratio of NaBF, to NaF in the salt, is also added to the pump bowl
vapor space to compensate for the BF; that is removed from the circulating
salt in the off-gas stream. This gas, together with volatile materials
from the salt (e.g., BF3 and H;0 reaction products, tritium, etc.), passes
from the pump bowl gas space, through the SMV gas space, and then in se-
quence through the salt mist trap, the cold trap (—80°C), the cover gas
pressure control valve, and a mineral oil bubbler. Finally, the off-gas
stream flows to the stack by way of the suction line of the containment
system ventilation blower.
All of the salt-containing piping and components of the CSTF are
enclosed in a steel containment enclosure equipped with an evacuation
*
In its original design, the CSTF had a third side loop passing
through the salt mist trap. Prior to the tritium test, this third loop
was disconnected and the loop-side openings were capped off.
ORNL-DWG 74-8978R
= SALT
MONITORING
785 GPM - 96 FT. HEAD
COVER GAS VESSEL E==—= = OFF-GAS 800°-1150° F. €
5-25 PSIG —BF; RECOMBINER SURVEILLANCE
AR SPECIMEN
LEVEL T7 ggkg l ‘ /J. AIR-COOLED 1
ELEMENT , , / HEAT EXCHANGER ,\’
bbb -
I B
MOTOR
l CONTROLLED
MANUALLY DAMPER /
AIR
OPERATED —
DAMPER | [\ —= EXHAUST
r—('—r— 7O BLOWER
P
FI.OWMETER—/
ECONOMIZER
GRAVITY f
CONNECTIONS FOR [‘ DAMPER
FUTURE EXPERIMENTS N
M A B m o[ /L_____———————-—’_’__
— O O
Ij
LOAD ORIFICE
FREEZE VENT \
VALVE Ttfi:GAS SUPPLY EQUALIZER LINE
FILL &
DRAIN TANK
'Fig. 1. CSTF schematic.
blower. The containment and ventilation system provides secondary con-
tainment for any salt leak and also provides for safe disposal of any gas
released from the facility. The enclosure is maintained at a slightly
negative pressure by the 1.4 m3/s (3000 cfm) blower. The blower suction
line is connected to parallel cooling ducts on the salt loop piping (Fig.
1) whereby more or less air can be drawn through the cooling ducts as
dictated by the loop cooling requirements.
2.3 Operating History of CSTF
The CSTF became operational for the first time in October of 1972.
Several runs° were made observing and measuring such things as cavitation
at the load orifice (Fig. 1), BF3; content of the BF3-He off-gas stream,
salt flow through the SMV, proton activity in the salt, and chemical
composition of the salt.
In February of 1973, the CSTF was placed in standby because of the
cancellation of the MSR program. From February 1973 through March 1974,
the system was maintained in standby, namely at room temperature with a
static pressure of 5 psig helium blanketing the salt-containing portions.
In April 1974, the MSR program was restarted and work was begun on recom-
missioning the CSTF in preparation to study tritium behavior in sodium
fluoroborate. Deuterium was originally to be added to the system as a
stand-in for tritium; however, the necessary analytical equipment required
for measuring the anticipated concentrations of deuterium would not have
been operational at the time the experiments were to be conducted. Conse-
quently, the decision was made to use tritium which could be measured with
available radioactive counting techniques.
Once the CSTF was restarted, two important modifications were made.
First, a second load orifice was installed in the main circulating loop.
The two orifices in series permitted operation of the loop at maximum
conditions of temperature [894 K (1150°F)] and pump speed without signifi-
cant cavitation. Second, a salt mist trap was installed in the off-gas
%
line at the outlet from the salt cold trap to prevent plugging of the
*
" The cold trap in Fig. 1 is a salt cold trap while the cold trap in
Fig. 2 is an off~gas cold trap.
off-gas line by deposition of frozen salt mist. The salt mist droplets
were generated in the pump bowl and were carried out with the off-gas
stream and deposited at a point where the temperature fell below the
freezing point of the salt. The salt lines (economizer in Fig. 1) from
the salt mist trap to the pump suction line were also disconnected for
the tritium tests.
During the initial operating period in 1972, salt was circulated
for 1060 hr. Since the CSTF was recommissioned in 1974, salt has been
circulated V8240 hr. On July 12, 1976, the loop was shut down following
the conclusion of the final tritium experiment and work was begun to
decommission the CSTF.
2.4 Equipment for Tritium Tests
The equipment for the tritium experiments consisted of (1) the
Coolant-Salt Technology Facility (CSTF), (2) the equipment needed to add
measured quantities of tritium to the circulating salt, (3) the sampling
and analytical equipment needed to determine the distribution of the
tritium between the various possible sinks.
2.4.1 CSTF physical parameters for tritium tests
A schematic of the CSTF as it was used in performing the tritium
experiments is presented in Fig. 2. Table 2 presents the operating and
geometrical parameters used for the CSTF tritium tests.
2.4.2 Addition of tritium to CSTF
The addition of tritium into the circulating salt stream was accom-
plished by means of a special addition tube assembly installed in the
surveillance specimen access tube (Figs. 1 and 2) in place of the regular
surveillance specimen holder. The surveillance specimen station was orig-
inally designed to permit exposure of Hastelloy N metal coupons to salt
at normal velocities and temperatures of the loop. This location of the
addition tube ensured that the tritium could not pass directly into the
off-gas system without first coming in contact with the circulating salt.
The inner part of the addition assembly was charged with a mixture of
hydrogen and tritium at a desired pressure, the gas then permeated or
ORNL-DWG 76-13057
AIR
—— HELIUM PURGE
TO PUMP SHAFT Z 77 //'I*L; > T ]
5
PRESSURE ,
<t OFF-GAS SAMPLE POINT CONTROL '
(100 cm3/min) OFF-GAS
VALVE s
(1900 cm=/min)
SALT SAMPLE - \\
ACCESS POINTS .
MINERAL
r. Ol - TRITIUM
—_— , BuUBB il
BF3 - o r MIST hl'--]”COLD Y LER / ADDITION
“lsmv i1 7 TRAP - 7 : DEVICE
HELIUM ——Y TRAP U ]
AIR AIR 1
COVER GAS j T L] + * EXHAUST
(2000 cm>/min) SALT PUMP , L I | AIR
@ e ——— 1.4 ms/sec
HYDROGEN AIR
- PARTIAL * + v
PRESSURE | r
PROBE —» &
AIR
-4 3/ SAMPLE f T
1.25x10 " m /sec max POINT | 1 V_N.F.IAI»C\XJ ION
| ,
- - I \
L OWER COOLING DUCT T LOAD
5in., SCHED 40, HAST N PIPE « ’ T T \OR'F‘CES
0.054 m3/sec max * LOOP
450-650°C AIR AIR ENCLOSURE
EQUALIZER
LINE
DRAIN
TANK
Fig. 2.
\ FREEZE VALVE
CSTF schematic for tritium experiments.
10
Table 2., Operating and geometrical parameters
assumed for CSTF tritium tests
Main loop salt flow rate 540 x 107" m’/s 850 gal/min
(pump speed = 1790 rpm)
Bypass salt flow rates
(pump speed = 1790 rpm)
Pump bowl bypass flow rate 9.50 x 10™"* m*/s 15 gal/min
Salt monitoring vessel flow rate 1&25 x 107" m¥/s Zagal/min
Salt mist trap flow rate 0 0
Total bypass flow rate 10.75 x 10~* m®/s 17 gal/min
Main loop piping geometry
Outside diameter 141 mm 5.56 in.
Inside diameter 128 mm 5.05 in.
Wall thickness 6.6 mm 0.26 in.
Wetted surface excluding pump bowl 4.5 m? 48.4 ft?
Wetted surface in pump bowl 1.0 m? 10.8 ft?
Pump bowl surface exposed to gas 0.68 m? 7.3 ft?
space
Volumes
Loop piping including SMV and 150 x 1073 m?® 5.30 ft?
salt mist trap, excluding pump ’
bowl
Circulating salt including pump 270 x 10~% n® 9.53 ft?
bowl
Pump bowl liquid 120 x 107°% m? 4.24 ftd
SMV liquid by2 % 1073 m? 0,15 fel
Salt mist trap liquid 0 0
Pump bowl vapor space 57 x 10~ m? 2.01 ft3
SMV vapor space 7.3 x 107% n?® 0.26 ft?
Salt mist trap vapor space 2.8 x 1073 m? 0.10 ft?
a .
The salt lines were disconnected from the salt mist trap, so that
during the tritium test there was no salt flow or salt inventory, other
than accumulated salt mist, in the salt mist trap.
11
diffused through the wall of the Hastelloy N tube which formed the lower
end of the addition tube and was immersed in the circulating salt stream.
The Hastelloy N tube was about 120 mm (4.7 in.) long with an OD of 12.7 mm
(0.5 in.), and a wall thickness of 1.07 mm (0.04 in.), and the provision
was made to fasten metallurgical surveillance
face.
500-cm>
VOLUME
TRITIUM
TRANSFER
CYLINDER
PURIFIER
SAMPLE
VACUUM
1000-cm® VOLUME
HYDROGEN
Fig. 3.
Tritium addition
specimens to the upstream
ORNL~-DWG 75-12616R
%
35°C
VACUUM
ANNULUS -__
100 °C
ADDITION
TUBE
system.
Connected to the tritium addition assembly was the equipment needed
to supply measured quantities of tritium to the CSTF (Fig. 3).
The high-
pressure, tritium transfer cylinder was charged with tritium, and the
cylinder was connected to the addition system and charged with hydrogen
from the hydrogen supply bottle to a total pressure calculated to yield
the desired tritium isotope concentration.
was fed from the cylinder through the purifier until the 500 cm
was charged with purified gas to the desired pressure.
the 500 cm® volume was used to charge the
assembly. A d/p cell was used to measure
in the addition assembly due to diffusion
hydrogen into the salt. For a short-term
The tritium-hydrogen mixture
* volume
Purified gas from
addition tube and addition
the resulting pressure drop
of the mixture of tritium and
experiment, the reference volume
(Vr) and addition tube volume (Vp) could be charged directly without using
the 500—cm3 volume.
A rupture disk was connected to the hydrogen supply
12
to minimize the probability of overpressurizing the system. The purifier
was simply a heated palladium tube through which hydrogen isotopes diffuse
more readily than heavier gases such as 0Oz, Nz, and H20. A vacuum pump
was used to evacuate the annulus surrounding the addition tube in the high
temperature zone adjacent to the salt piping (Fig. 3). Measurements of
the-pressure rise in the vacuum annulus were used to estimate the amount
of stray leakage that occurred during the addition of tritium. A sampling
point was provided to obtain samples for mass spectrometer analysis to
determine the concentration of tritium in the addition gas.