Skip to content

Clean up use of WORKSPACE.bzlmod so we can move fully to bzlmod #242

Clean up use of WORKSPACE.bzlmod so we can move fully to bzlmod

Clean up use of WORKSPACE.bzlmod so we can move fully to bzlmod #242

Triggered via pull request February 5, 2025 00:58
Status Cancelled
Total duration 7m 4s
Artifacts

action.yml

on: pull_request
Matrix: e2e-bzlmod-build-toolchain-matrix
Matrix: e2e-bzlmod-matrix
Matrix: e2e-workspace-matrix
Fit to window
Zoom out
Zoom in

Annotations

17 errors
e2e-bzlmod-matrix (6.x, bazel-bzlmod)
Process completed with exit code 1.
e2e-bzlmod-matrix (7.x, bazel-bzlmod)
Process completed with exit code 1.
e2e-bzlmod-matrix (6.x, bazel-bzlmod-non-legacy-mode)
Process completed with exit code 1.
e2e-bzlmod-matrix (6.x, bazel-bzlmod-lock-file)
The job was canceled because "_6_x_bazel-bzlmod" failed.
e2e-bzlmod-matrix (6.x, bazel-bzlmod-lock-file)
Process completed with exit code 1.
e2e-bzlmod-matrix (7.x, bazel-bzlmod-non-legacy-mode)
The job was canceled because "_6_x_bazel-bzlmod" failed.
e2e-bzlmod-matrix (7.x, bazel-bzlmod-non-legacy-mode)
Process completed with exit code 1.
e2e-bzlmod-matrix (7.x, bazel-bzlmod-lock-file)
The job was canceled because "_6_x_bazel-bzlmod" failed.
e2e-bzlmod-matrix (7.x, bazel-bzlmod-lock-file)
Process completed with exit code 1.
e2e-bzlmod-build-toolchain-matrix (6.x)
Process completed with exit code 1.
e2e-bzlmod-build-toolchain-matrix (7.x, --incompatible_enable_proto_toolchain_resolution)
The job was canceled because "_6_x" failed.
e2e-workspace-matrix (6.x, import %workspace%/../../.aspect/bazelrc/bazel6.bazelrc )
The job was canceled because "_7_x_import__workspace___" failed.
build-and-test
Canceling since a higher priority waiting request for 'concurrency-group::build and test::pr-98' exists
build-and-test
The operation was canceled.